• Details
  • Ground mortar

    1. Product overview:

    The ground mortar is made of high-quality cement, sand, and selected additives. It is used for new construction and maintenance of ground projects. After completion, the surface is smooth and flat, suitable for the ground of residential or commercial buildings.

    2. Product features:

    The mortar has the characteristics of high hardness, good wear resistance, weather resistance and aging resistance, long service life and convenient use. It completely overcomes the shortcomings of ordinary ground that is easy to wear and has a short service life, and saves the cost of periodic maintenance.

    3. How to use:

    1. Mixing: Add 160~190 kg of clean water per ton of this product (can be increased or decreased according to site construction requirements), and mix it in a clean container (or use a mixer) to form a "paste". Then let it stand for 3-5 minutes and stir again to use. The stirred mortar should be used up within 2 to 3 hours. Mix and use as needed

    2. Construction: a. Quality requirements of the base layer The compressive strength of the concrete base layer is required to be 1.2 N/mm before surface construction can be carried out. To

    b. Pouring and paving According to the design thickness of the ground and the design elevation, a ash cake is made on the base layer; the base layer is well connected with the grout, and the requirements are uniform, and the placement of the slurry and dry grout phenomenon; the concrete surface layer should be selected according to the thickness Roll back and forth horizontally and horizontally three times, or use a flat plate to vibrate and press, until mud and no stones are exposed on the surface; the cement mortar surface should be compacted with the paving, and leveled with a scraper; during pouring or spreading It is strictly forbidden to add water. To

    c. Smoothing and calendering The mortar is calendered for the first time before the initial setting, the second time is calendered before the final setting, and finally pressed out with force, preferably three times. To

    d. Maintenance The ground shall be maintained within 24 hours after the completion of the ground, and the continuous maintenance shall not exceed 7 days. It can be irrigated or covered with grass foam or straw bags on the ground to avoid direct watering. To

    3. Dosage: Appropriate use depending on the construction situation on site

    4. Packaging and storage:

    1. This product is packed in woven bags, 50 kg per bag.

    2. Lightly unload, prevent rain, and store in a dry place for 3 months

    In the environment of temperature below -5, our company's products are added with our company's antifreeze, which can be constructed as usual without affecting the quality of the project.

Product inquiry

Contact Us

+86 13466623391

Beijing New Junjie Building Materials Factory

Address: 360 Xinzhuang Village, Changxindian, Fengtai District, Beijing

Mailbox:807273479@qq.com

Zhuozhou New Junjie New Material Technology Co., Ltd 

Address: Baijiazhuang Village West Yihezhuang Town, Zhuozhou City, Hebei Province

Two-dimensional code

Sweep, pay attention to the mobile phone version

Copyright©2020 Beijing Xinjunjie Building Materials Factory All Rights Reserved

Business License